Independent daily summary of public forum activity, compiled by Anode Research. Not an official communication of Reserve or Rootstock Collective. Anode participates in both as a delegate.
Proposals and RFCs
Proposal update: [2606 Grant] Andromeda Core, Autonomous Reputation Infrastructure (Milestone 1), https://gov.rootstockcollective.xyz/t/876
No new proposal opened this window. The single post is the grantee (Ilichb) replying to a reviewer's read of the Milestone 1 report. Nothing in the Grants and Incentives / Collective Rewards feeds or app.rootstockcollective.xyz proposal links beyond this.
New topics
None.
Discussion by topic
[2606 Grant] Andromeda Core, Milestone 1 (topic 876, Grants & Incentives)
- Post 3993 by Ilichb (2026-10-04): Grantee confirms alignment with @DAOstar_gov on three points. The corrected cohort of 18 is the frozen baseline (no scope re-opening). The risk-disclosure gap is documented for the next iteration. The builder-prospecting model is the right direction for Phase 2 if the pilot produces a signal worth scaling.
- The post closes with: "We're now in execution mode."
Sentiment
Supportive and collaborative. A coordination thread, not a funding ask or vote. Ilichb explicitly accepts the reviewer's framing on all three points and signals the project is shifting into execution, aligned and constructive, no opposition raised.
What to watch
- No votes imminent; no new proposals or applicants; no contentious threads.
- Light watch: Andromeda Core is the active [2606] grant mid-lifecycle (Milestone 1 reporting and Phase 2 planning). The "risk-disclosure gap documented for the next iteration" note confirms the cohort and scope baseline (18 projects) is now formalized, relevant if a formal change request or Phase 2 proposal surfaces later.